New job in the shop! Working on getting the engine pulled out for painting. The engine is finally out of the Mini and Bryan will start degreasing it and cleaning it up for paint. Continuing forward with the engine and accessories. Resealing the gear box and getting...
Getting ready to drop in the new drivetain. The Fords engine is painted and installed. Installing the new AOD tranny and the new high flow radiator. Finishing the install off the tranny and linkage today.
The floor is finally at a point where we are able to start welding it and the cowl patch panels in. Continuing the assembly of the bed. The rear crossmember is welded in and brian is starting on the wood bed. Finishing up the metal work to the cab and staining the bed...
Dan has tuned up the engine, installed the new heater control valve and installed the new master cylinder. Installing the rebuilt radiator and fuel tanks.
The old carpet as you can see in the pic is no good. The new carpet is here and ready to install. The new lower radiator support is fabbed up and Bryan has started to work on the rear brake conversion. Installing the struts, rear disk brakes, pulling out the interior...