New job in shop! 1968 Checker Marathon Taxi Cab. Ben has started on the disassembly and mechanical repairs for the Checker. Ben has the engine and tranny out, and is stripping them down today for repairs and paint. He also is getting ready to power wash the engine...
Disassembly has begun. Disassembly continues. Blasting the Nash Ambassador. In the booth to get etched and sealed. The nash and all of it’s panels are now in etch prime. Justin is hard at work on repairing the body for the ’48 Nash. Repairing the rockers...
Working on the floor replacement. New floor pans installed for the Skylark and now Mike is working on the Frame repair. Mike has repaired the frame and applied the POR 15.
Removing the engine for resealing. Repairing the wiring in the engine bay and the engine has been painted. Engine installed in the Fairlane and Bryan is installing the accessories. Hood back on and the engine is installed and running great.