by pcr_admin | Dec 21, 2011 | Chevy
The floor is finally at a point where we are able to start welding it and the cowl patch panels in. Continuing the assembly of the bed. The rear crossmember is welded in and brian is starting on the wood bed. Finishing up the metal work to the cab and staining the bed...
by pcr_admin | Dec 19, 2011 | International
Dan has tuned up the engine, installed the new heater control valve and installed the new master cylinder. Installing the rebuilt radiator and fuel tanks.
by pcr_admin | Dec 15, 2011 | International
Working on the mechanical restoration today.
by pcr_admin | Dec 13, 2011 | International
New job in shop for some mechanical restoration.
by pcr_admin | Jun 14, 2011 | GMC
New job in shop! The rear track bar has been repositioned and a new mount has been fabricated.